Equipment erection & installation
Placement, levelling and grouting coordination for process and auxiliary equipment as per approved layouts.

Installation, erection and alignment of plant machinery and mechanical systems for cement, power, steel and fertilizer plants, executed to approved drawings, OEM instructions and agreed specifications.
Reliable plant performance starts with accurate mechanical installation. MME’s scope can cover equipment erection, alignment, piping, material-handling systems and commissioning support, each aligned with approved drawings, OEM requirements, site conditions and the agreed contract scope.
Discuss your scopePlacement, levelling and grouting coordination for process and auxiliary equipment as per approved layouts.
Fans, blowers, pumps, compressors, gearboxes and drives, installed and aligned to OEM tolerances.
Process, utility and service piping with supports, flanged joints and pressure-test coordination.
Belt conveyors, bucket elevators, feeders, chutes and hoppers erected and aligned for smooth material flow.
Mechanical auxiliaries for boilers, turbines, kilns, mills and process units, within the agreed package.
Pre-commissioning checks, cold alignment, no-load and trial-run support with plant and OEM teams.
Our mechanical packages are delivered for the following plant types, subject to project design and agreed scope. Select a plant to read more.
Explore all services
A structured sequence keeps scope, lifting plans, alignment checks and coordination with OEM and plant teams clear before work moves to the next stage.
Review GA drawings, OEM manuals, equipment lists, access and lifting requirements.
Tools, tackles, manpower and work-area readiness; foundation levels and centre-lines verified.
Safe lifting, placement, levelling, alignment and fastening in the planned sequence.
Alignment records, test documents, trial-run support and close-out documentation.
Inspection and testing follow the approved project specifications, Inspection and Test Plan (ITP), OEM instructions and the engineer’s directions. Site execution follows the applicable permit, lifting, hot-work and work-area safety procedures.
Shaft, coupling and level checks recorded against specified tolerances.
Foundation, anchor bolts, material condition and fit-up verified before erection.
Pressure tests, no-load runs and trial documentation, as specified.
Lift plans, permits, rigging checks and project-specific risk controls.

A glimpse of the industrial work covered by this service.




Answers to common queries about our mechanical works.
Our mechanical works are offered for cement, power, steel and fertilizer plants, covering installation, erection and related mechanical packages as defined in the agreed scope.
Yes. Installation and alignment follow approved drawings and the OEM’s instructions, and the OEM’s supervisors can be coordinated where the contract requires.
They can be scoped as an integrated package or as separate packages, depending on the project and contract boundaries.
Share the project location, equipment list, drawings, specifications, BOQ or approximate quantities, schedule and the work package you want to discuss.
Pre-commissioning checks and trial-run support can be included in the scope. Responsibilities for operation, supply of consumables and performance guarantees should be agreed in advance.
Share your plant and equipment details with us, including drawings and BOQ information, so we can review your enquiry accurately.